ADU Company in Pedley — Design, Permits and Build Under One Contract

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

✓ Licensed & Insured ✓ Written quotes ✓ Permits handled
Schedule Free Estimate

Call to schedule your free estimate

🛡 Licensed & Insured 📝 Written Fixed-Price Quotes 💲 No Change Orders · Free Estimates

ADU Company in Pedley, CA

Kitchen remodeling in Pedley means working with older, semi-rural Riverside County homes where layouts were built for a different era, outbuildings are common, and intense summer heat puts real strain on ventilation, cooling, and material choices. We’re Newport Beach ADU Builders, and we’ve served Pedley since 2016 as a full-service ADU and remodeling contractor, handling everything from detached ADUs to complete kitchen renovations under one roof. The county permit process here runs through Riverside County, not a city hall, which changes how we plan, price, and schedule every job. Call (844) 934-0236 for a free estimate and we’ll walk you through what’s actually possible on your lot.

Call (844) 934-0236

Why Pedley Homes Are Different

Pedley sits in the hot, dry Jurupa Valley corridor of western Riverside County, where summer temperatures routinely push cooling systems hard and Santa Ana winds deliver dust and dry gusts that settle into older kitchens and unfinished spaces. Much of the housing stock is mid-century and later, built on oversized lots with detached garages, shops, and outbuildings that newer, denser cities simply don’t have. Those generous parcels are exactly what make detached ADUs and garage conversions feasible here, but they also mean many homes run on septic systems and private wells, not municipal sewer and water. Before any ADU or major remodel gets permitted, Riverside County often requires percolation tests and water-supply checks, a step that disappears the moment you cross into a sewer-served city like Eastvale or Jurupa Valley. For kitchen remodeling specifically, the older framing, dated electrical panels, and long duct runs in these semi-rural homes change the scope in ways a tract-home remodeler might miss.

Our Main Pedley Services

Most Pedley homeowners reach out to us about two things: adding an ADU to a large lot, and bringing an aging bathroom or kitchen into the current decade. Both run through the same county permitting process, and both benefit from having one contractor who understands Riverside County rules.

ADU Builders in Pedley

Detached ADUs, garage conversions, and prefab units all make sense on Pedley’s oversized parcels, but the county’s septic and well checks add a planning step that doesn’t exist in incorporated cities nearby. We handle that paperwork, match you to the right manufacturer for your lot, and manage the build from foundation to final inspection. ADU Builders in Pedley covers the full breakdown of options, timelines, and what we’ve seen work on these semi-rural lots.

ADU Builders in Pedley

Bathroom Remodeling in Pedley

Older Pedley homes often have small, compartmentalized bathrooms with original cast iron plumbing and no ventilation beyond an undersized window. That’s a recipe for moisture problems in a dry climate that swings to cold Santa Ana nights. We remodel bathrooms with ventilation, water-efficient fixtures, and layouts that actually work for the way families use these mid-century homes. Bathroom Remodeling in Pedley has the full scope and pricing details.

Bathroom Remodeling in Pedley
Need help today?Fast, friendly service and a no-obligation free estimate.

Call (844) 934-0236

What happens when you call

  1. 1
    A real person answersNo phone trees — you reach a local pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched.
  3. 3
    A background-checked tech heads outLicensed & insured, dispatched right away.
  4. 4
    You approve before work beginsNothing starts until you say go.

Kitchen Remodeling in Pedley

Most Pedley kitchens were built when the standard was a 30-inch gas range, a single wall oven, and a peninsula separating the cook from everyone else. The homes are solid, but the layouts no longer match how people actually live, especially when an ADU goes in and the main kitchen suddenly serves two households. We remodel kitchens across Pedley to open sightlines, add ventilation that matters during those long hot summers, and harden the materials against the dust and dryness that come with Santa Ana season. If you’re also considering an ADU, we coordinate both projects so you’re not living through two separate demolition cycles. Our Kitchen Remodeling work spans cabinet refacing to full gut renovations, and we bring the same county-permitting fluency to both.

Cabinet Replacement

Signs you need it

Face frames are pulling away from the boxes, drawer slides bind or fall out, or the existing cabinet layout wastes corners and blind spaces that a modern design would use.

What it costs in Pedley

Full cabinet replacement in Pedley typically runs $18,000 to $38,000 depending on linear footage, door style, and whether we’re rebuilding the layout or swapping boxes in place.

How we do it

We measure the full run, order cabinet boxes and doors matched to your door style and finish, remove the old cabinets, and install the new ones level and anchored to studs, then set countertops and hardware.

Countertop and Backsplash Upgrade

Signs you need it

Laminate is peeling at the seams or scorched near the range, grout lines are stained beyond cleaning, or you want a surface that can handle heavy daily use without showing every knife mark.

What it costs in Pedley

Count on $4,000 to $9,500 for a typical Pedley kitchen, less if you keep the existing cabinets and only replace the horizontal surfaces and wall tile.

How we do it

We template the counters, cut and install the new surface with a sealed edge, add the backsplash in the material you chose, and reconnect the sink and faucet the same day.

Full Kitchen Renovation

Signs you need it

The layout doesn’t work for more than one cook, the electrical panel can’t support modern appliances, or you’re adding an ADU and the kitchen now has to serve more people than it was built for.

What it costs in Pedley

A full Pedley kitchen renovation runs $45,000 to $85,000 when it includes layout changes, new cabinets, counters, flooring, electrical, plumbing, and ventilation.

How we do it

We demo to the studs, reframe as needed, update electrical and plumbing to current code, install cabinets and counters, set appliances, then finish with flooring, paint, and trim.

What Kitchen Remodeling Costs in Pedley

Item Typical range in Pedley
Cabinet replacement $18,000 – $38,000
Countertop and backsplash upgrade $4,000 – $9,500
Full kitchen renovation $45,000 – $85,000

What pushes the price up in Pedley is the age of the house: older electrical panels often need upgrades to carry a modern appliance load, and septic-tank proximity can limit where we relocate plumbing without triggering a county review. We price fixed, line-itemed, and upfront, so the number we quote is the number you pay, no change orders hiding in the wall cavities.

How long does a kitchen remodel take in Pedley?

Most Pedley kitchen remodels take 4 to 10 weeks depending on scope and whether the county needs to inspect electrical or plumbing changes on a septic-served parcel. Cabinet-only replacements run shorter; full gut renovations with layout changes run longer. Call (844) 934-0236 and we’ll give you a realistic schedule for your specific home.

Will a kitchen remodel in Pedley require county permits?

Yes. Any work that touches electrical, plumbing, or load-bearing walls in Pedley goes through Riverside County’s building process, not a city office. We pull the permits, schedule inspections, and handle every county requirement. Call (844) 934-0236 for a free estimate and we’ll explain exactly what your project triggers.

Brands We Service in Pedley

We build and install from a curated manufacturer roster that includes Boxabl, Plant Prefab, and Tuff Shed, and we use James Hardie fiber-cement siding on projects where exterior durability matters most. Components and materials ship directly to Pedley job sites, and we coordinate delivery so you’re not storing materials in your driveway for weeks. See our brands for the full list and what each one does best.

Pricing for ADU Company in Pedley, CA

Service Typical range in Pedley
Detached ADU (turn-key) $180,000 – $320,000
Garage conversion ADU $110,000 – $195,000
Prefab ADU (factory-built) $140,000 – $260,000
Bathroom remodel (standard) $12,000 – $28,000
Bathroom remodel (full gut) $25,000 – $45,000
Kitchen cabinet replacement $18,000 – $38,000
Kitchen countertop and backsplash upgrade $4,000 – $9,500
Full kitchen renovation $45,000 – $85,000

Septic and well checks required by Riverside County add pre-construction time and occasionally a percolation or water-flow test fee, which is the main thing that pushes costs higher in Pedley than in sewer-served cities. We give fixed, line-itemed quotes before work starts, and we don’t change the price once the contract is signed.

Neighborhoods We Serve in Pedley

We work throughout the 92509 ZIP code and the surrounding unincorporated parcels that run up against the Santa Ana River corridor. Response times across Pedley are consistent, and we schedule estimates within a few business days.

  • North Pedley
  • South Pedley
  • West Pedley near the river
  • East Pedley

Service Area – Cities Near Pedley

We also serve homeowners in the neighboring communities of Glen Avon, CA, Sunnyslope, CA, Rubidoux, CA, and Riverside, CA. Each of those areas has its own permit authority and housing stock, and we navigate those differences the same way we handle Riverside County’s rules here in Pedley.

Serving Pedley, CA — Our Local Coverage Area

We’re based in the Pedley area and know this community well. Use the map below to see our service coverage — if you’re nearby, we can almost certainly help.

FAQs About ADU Company in Pedley

Ready to get started? Free estimates · Free written quotes response in Pedley
Call (844) 934-0236

What happens when you call

  1. 1
    A real person answersNo phone trees — talk to a local adu pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you — the visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Pedley Customers Say

★★★★★ 4.8 from 4+ reviews

"Sound insulation between the unit and the main house is better than I expected. You genuinely cannot hear the tenant."

— Malik Nash

"Detached unit in the back yard. Utilities trenched, separate meter, and it passed final on the first inspection."

— Steven Nguyen

"Unit came out great and the tenant is happy. The timeline ran long, largely because of how slow the city was on plan check, though a couple of the delays were scheduling on their end."

— Heather Ackerman

How It Works in Pedley

Getting your adu handled is simple and fast.

1

Call or Request a Free Estimate

Tell us about your adu needs and we provide an upfront, transparent quote — no obligation, no hidden fees.

2

Licensed Technician Dispatched

A background-checked, certified technician arrives in Pedley — typically within 30–60 minutes, with parts stocked on the truck.

3

Problem Solved, Guaranteed

We complete the job to your full satisfaction, backed by our warranty and 100% satisfaction guarantee.

Request a Free Estimate

Tell us what's going on in Pedley — we'll get back to you fast. No obligation.

By clicking submit, you agree to the terms of our Privacy Policy and consent to being contacted by call, text, or email regarding your project, including by the service partners who may complete the work.

Prefer to text? Text Us
Call Now - 24/7 Dispatch
Areas We Serve
Call Now - 24/7 Dispatch