ADU Company in Bloomington, CA
Kitchen remodeling in Bloomington usually means opening up a galley kitchen in a 1950s or 1960s stucco ranch, often while the rest of the house stays put. We handle the whole job: demolition, plumbing, electrical, cabinetry, countertops, and the finishes that survive Inland Empire heat. Newport Beach ADU Builders has served Bloomington since 2016, and we know these homes well enough to budget for what’s actually behind the drywall. Call (844) 934-0236 for a free estimate on your Bloomington kitchen remodel.
Why Bloomington Homes Are Different
Bloomington sits unincorporated in San Bernardino County, that stretch along the I-10 corridor between Fontana and Rialto where lot sizes stayed generous while the cities around it filled in. The housing stock is mostly mid-century single-story: stucco exteriors, block-wall perimeter fencing, rear alley access on many streets, and detached garages set back toward the alley line. Those lot conditions matter for kitchen work because they change how we run gas, drain, and electrical lines, and they often mean we have room to expand the kitchen footprint outward where the wall faces a side yard or rear yard instead of a tight setback.
The climate drives material choices here. Bloomington summers run hot and dry, with Santa Ana wind events in the fall that kick up dust and strain anything installed half-right. Kitchens in these older homes often have original single-pane windows, inadequate venting, and cabinet boxes that have warped through decades of heat cycling. When we remodel a Bloomington kitchen, we plan for high-output range hoods, insulation where the exterior wall opens up, and finishes that hold up to direct afternoon sun coming through west-facing windows. Flat or low-slope roofs on many of these ranches also mean we check attic ventilation and roof drainage before closing up a ceiling.
Our Main Bloomington Services
Most Bloomington homeowners call us about two things: building an ADU on a large rear lot, or updating a bathroom inside an aging ranch. Here’s how each works here.
ADU Builders in Bloomington
Bloomington’s oversized lots and rear alley access make detached casitas unusually practical compared to neighboring cities. We handle county permitting, site work, and the full build, from a budget-conscious Tuff Shed conversion to a design-forward factory-built unit from Boxabl or Plant Prefab. Since Bloomington is unincorporated, ADU permits route through San Bernardino County rather than a city building department, which changes timelines and plan-check requirements. We’ve been through that process enough to know where the delays hide. ADU Builders in Bloomington

Bathroom Remodeling in Bloomington
Bathrooms in Bloomington’s 1950s and 1960s homes are tight: original cast-iron tubs, wall tile set in mud beds, and vanities under 30 inches wide. We rework the footprint where possible, update plumbing to modern codes, and install fixtures that can handle the hard water common in San Bernardino County. Because these homes sit on slab foundations, moving a drain line means cutting concrete, which is why our quotes here are always based on a site visit, not a phone estimate. Bathroom Remodeling in Bloomington

What happens when you call
- 1
A real person answersNo phone trees — you reach a local pro.
- 2
You get an upfront price rangeHonest numbers before anyone is dispatched.
- 3
A background-checked tech heads outLicensed & insured, dispatched right away.
- 4
You approve before work beginsNothing starts until you say go.
Kitchen Remodeling in Bloomington
Kitchen remodeling in Bloomington comes down to this: most of these kitchens were designed before dishwashers, microwaves, and two-income households existed. Counters are short, cabinet boxes are narrow, and there’s never enough storage or task lighting. We solve that by reconfiguring the existing footprint or expanding into the side yard, and we match materials to the Inland Empire climate so the work lasts. For a broader look at how we approach kitchen work, see our Kitchen Remodeling page.
Full Kitchen Gut and Rebuild
Signs you need it
Your cabinet doors won’t stay square, the counter is cracked or delaminating, and your layout forces two people into a single three-foot aisle, which happens constantly in these original Bloomington galley kitchens.
What it costs in Bloomington
A full kitchen gut and rebuild in Bloomington typically runs $45,000 to $80,000, with the final number depending on cabinet grade, countertop material, and how much electrical or plumbing has to move.
How we do it
We strip the room to studs, rough in new plumbing and electrical, level the floor, install new cabinetry and counters, then finish with tile, lighting, and a properly vented range hood.
Cabinet Refacing and Countertop Replacement
Signs you need it
Your cabinet boxes are solid but the doors are worn, dated, or warped from decades of Bloomington heat, and your laminate counters have burns, chips, or water damage at the seams.
What it costs in Bloomington
Cabinet refacing and new countertops in Bloomington generally cost $8,000 to $18,000 depending on door style, hardware, and whether you choose quartz, granite, or a solid surface.
How we do it
We replace doors, drawers, and hardware, apply matching veneer to the boxes, then template and install new countertops, typically without disturbing the existing floor or layout.
What Kitchen Remodeling Costs in Bloomington
| Item | Typical range in Bloomington |
|---|---|
| Full kitchen gut and rebuild | $45,000 – $80,000 |
| Cabinet refacing and countertops | $8,000 – $18,000 |
| Kitchen island addition | $6,000 – $15,000 |
How long does a Bloomington kitchen remodel take?
A full gut and rebuild takes 8 to 12 weeks in Bloomington. Refacing and countertops usually wrap in 2 to 3 weeks. County permits and material lead times are the two schedule drivers we can’t fully control, but we order early and stage materials to avoid gaps.
Will the price change once work starts?
Not unless you change the scope. Our written quotes include a fixed line-item breakdown, and we flag any unknown like hidden slab plumbing or asbestos in old flooring before we start cutting. Call (844) 934-0236 to get a number for your kitchen.
Brands We Service in Bloomington
We install and service kitchen and ADU products from several manufacturers, including Boxabl, Plant Prefab, Tuff Shed, and James Hardie. Parts for common James Hardie siding profiles and Tuff Shed components are stocked within a drive of Bloomington, so we’re not chasing pieces from out of state. See the full list on our brands page.
Pricing for ADU Company in Bloomington, CA
| Service | Typical range in Bloomington |
|---|---|
| Full kitchen gut and rebuild | $45,000 – $80,000 |
| Cabinet refacing and countertops | $8,000 – $18,000 |
| Kitchen island addition | $6,000 – $15,000 |
| Detached ADU (prefab or modular) | $165,000 – $320,000 |
| Garage conversion ADU | $110,000 – $185,000 |
| Bathroom remodel (full) | $22,000 – $48,000 |
| Bathroom remodel (guest or half-bath) | $14,000 – $28,000 |
In Bloomington specifically, prices push upward when we hit old galvanized supply lines, slab-on-grade drain relocations, or kitchens and baths that haven’t been touched since the Johnson administration. You’ll get an upfront, written line-item quote before we start, and that’s the number we build to unless you change the scope.
Neighborhoods We Serve in Bloomington
We work throughout the 92316 ZIP code, from the older blocks near Cedar Avenue and Santa Ana Avenue up to the newer pockets west of Ayala Drive and south toward the Jurupa Hills. The big-lot neighborhoods off Locust Avenue and Slover Avenue are where most of our detached ADU and garage conversion work happens, but we’re in every corner of Bloomington for kitchen and bath remodels.
- Cedar Avenue corridor
- Santa Ana Avenue area
- Locust Avenue parcels
- Slover Avenue blocks
- West Bloomington near Ayala Drive
Service Area – Cities Near Bloomington
Beyond Bloomington, we take on projects across the surrounding Inland Empire. We do regular ADU and remodeling work in Fontana, CA and Rialto, CA, as well as the unincorporated pockets of Glen Avon, CA and Pedley, CA that share Bloomington’s county permitting path and mid-century housing stock.
Serving Bloomington, CA — Our Local Coverage Area
We’re based in the Bloomington area and know this community well. Use the map below to see our service coverage — if you’re nearby, we can almost certainly help.
FAQs About ADU Company in Bloomington
We schedule Bloomington projects on a route that includes Fontana and Rialto, so a first site visit usually happens within 5 to 7 business days of your call. Emergency work gets priority, but most of our Bloomington jobs are planned remodels and ADU builds, not emergency response.
Most Bloomington kitchen remodels require a San Bernardino County permit, especially if you’re moving plumbing, electrical, or a gas line. We pull the permits ourselves, schedule the inspections, and keep the job moving through plan check so you’re not stuck managing the county’s calendar.
Yes. We stage material deliveries early in the morning, schedule interior work like plumbing and electrical before the afternoon heat peaks, and we don’t let heat rush a job into shortcuts. The hard truth is that some materials, like certain adhesives and finishes, need cooler conditions, so we sequence around the forecast.
Ready to talk about your Bloomington kitchen, bath, or ADU project? Call (844) 934-0236 for a free, no-pressure estimate. We’ll walk your lot or your kitchen, give you real numbers, and tell you honestly what’s worth doing and what isn’t.
What happens when you call
- 1A real person answersNo phone trees — talk to a local adu pro.
- 2You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
- 3We come out and measureLicensed & insured, at a time that suits you — the visit and the quote are both free.
- 4You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.
What Bloomington Customers Say
"Detached unit in the back yard. Utilities trenched, separate meter, and it passed final on the first inspection."
— Steven Nguyen"Unit came out great and the tenant is happy. The timeline ran long, largely because of how slow the city was on plan check, though a couple of the delays were scheduling on their end."
— Heather Ackerman"Garage conversion to a one bedroom unit. He handled the plans, the city submittal, and every round of corrections. Took six months from first meeting to final inspection and he never once made the permit process my problem."
— Diego Castillo